PUBLIC NOTICE

The Annual Financial Report of the Village of Genoa for 2018 is complete, and has been filed with the Auditor of the State of Ohio.

The report is available for inspection at the office of the Fiscal Officer, 102 E. Sixth Street, Genoa, Ohio during normal business hours.
Julie A. Van Nest
Village of Genoa-Fiscal Officer

 

PUBLIC NOTICE
On March 4, 2019 the Council of the Village of Oak Harbor passed the following Ordinances:

Ordinance No. 01-2019 - AN ORDINANCE ACCEPTING THE HAYWARD FARMS, LLC ANNEXATION PETITION.

Ordinance No. 02-2019 - AN ORDINANCE ACCEPTING CENTRAL COLONY APARTMENTS, LLC ANNEXATION PETITION.

Ordinance No. 03 - AN ORDINANCE ESTABLISHING ZONING OF CENTRAL COLONY APARTMENTS, LLC ANNEXED PROPERTY.

The full context of each ordinace is available for inspection at the offi ce of the Fiscal Officer, Village of Oak Harbor Municipal Building, 146 N. Church, Street, Oak Harbor, Ohio during normal business hours or by appointment.

Amy E. Drummer, Fiscal Officer
VILLAGE OF OAK HARBOR
146 Church Street, P.O. Box 232
Oak Harbor, Ohio 43449-0232
(419) 898-5561 Fax (419) 898-2519
www.oakharbor.oh.us

 

PUBLIC NOTICE
The annual Financial report of the Village of Oak Harbor for 2018 is complete and has been filed with the State Auditor. The report is available for inspection at the offi ce of the Fiscal Officer, 146 N. Church Street, Oak Harbor, Ohio during normal business hours.
Amy E. Drummer, Fiscal Officer
VILLAGE OF OAK HARBOR
146 Church Street
P.O. Box 232
Oak Harbor, Ohio 43449-0232
(419) 898-5561 Fax (419) 898-2519

 

PUBLIC NOTICE

Salem Township, Ottawa County has filed the Annual Financial Report for fi scal year ending December 31, 2018 with the Auditor of the State of Ohio.

The reort is available for inspection by calling 419-898-2235. The report is on fi le at the fiscal office, 11650 W Portage River S Rd, Oak Harbor, OH
Sue Perrin, Fiscal Officer
Salem Township, Ottawa County
www.oakharbor.oh.us

 

PUBLIC NOTICE

ADVERTISEMENT FOR BIDS
SEALED BIDS for the furnishing of the necessary materials and construction of the WEST WATER SERVICE EXTENSION, OAK HARBOR, OHIO will be received by the Village of Oak Harbor, Ohio at the office of the Village Administrator, 146 Church Street, P.O. Box 232, Oak Harbor, Ohio 43449 until 2:00 p.m. (Local Time) Friday, March 22, 2019 and at that time and place will be publicly opened and read aloud.

The scope of work for this project consists of the installation of approximately 5,040 lineal feet of 12” waterline installed via directional drilling methods as well as an additional 2,500 lineal feet of 12” waterline installed via open-cut.

The contract documents, including plans and specif cations, are on file at the offi ce of the Village of Oak Harbor, Ohio and the Architect/Engineer – Poggemeyer Design Group, Inc. (PDG). The documents may be viewed and ordered online or obtained from Becker Impressions, 4646 Angola Road, Toledo, Ohio 43615, Telephone 419-385-5303, www.pdgplanroom.com for the cost of printing to be paid to the printing company at the time the documents are picked up. Shipping and tax charges are the bidder’s responsibility and payable directly to Becker Impressions.

The Engineer for the Project is Poggemeyer Design Group, Inc., 1168 North Main Street, Bowling Green, Ohio 43402.
All bids must be signed and submitted on the blanks which are bound in this booklet. Bids must state the unit prices in the blanks provided and be enclosed in a sealed envelope marked — WEST WATER SERVICE EXTENSION — and addressed to the Village of Oak Harbor, 146 Church Street, P.O. Box 232, Oak Harbor, Ohio 43449.

The bid guaranty may be of two forms:
1. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (Th e amount of the bid does NOT have to appear on this form.)

2. A certified check, cashier’s check or letter of credit in favor of the Village of Oak Harbor, Ohio in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond.

This procurement is subject to the EPA policy of encouraging the participation of small businesses in rural areas (SBRAs).

After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Ottawa County, Ohio.

The successful bidder will be required to pay not less than the highest applicable minimum wage rates as established by the federal Davis-Bacon Wage Determinations issued by the U.S. Department of Labor.

The Village of Oak Harbor, Ohio reserves the right to reject any and all bids and to waive any irregularity in any bid and to determine the lowest and best bidder.

No bidder may withdraw his bid for a period of 60 days after the scheduled closing time for the receipt of bids. This project is being partially funded with Ohio EPA Water Supply Revolving Loan Account (WSRLA) with Buy American requirements.

The estimated cost of construction is $775,000 for the Base Bid and $77,000 for Alternate No. 1.

By Order of

Randall Genzman, Village Administrator

 

 

 

Universal Income

What do you think of presidential candidate Andrew Yang's proposal for a universal basic income of $1,000 per month for every adult?
32550042 [{"id":"323","title":"It will help millions of people who are increasingly losing their jobs to automation.","votes":"1","pct":8.33,"type":"x","order":"1","resources":[]},{"id":"324","title":"No, if the proposal is paid for by tax payers.","votes":"10","pct":83.33,"type":"x","order":"2","resources":[]},{"id":"325","title":"Yes, if billionaires pay for it, as labor costs disappear due to automation.","votes":"1","pct":8.33,"type":"x","order":"3","resources":[]}] ["#194e84","#3b6b9c","#1f242a","#37414a","#60bb22","#f2babb"] sbar 160 160 /component/communitypolls/vote/118-universal-income No answer selected. Please try again. Thank you for your vote. Answers Votes ...